Exploration drilling at Bor

istražno bušenje jula 2019-01

GEOING GROUP signed a contract with SERBIA ZIJIN BOR COPPER DOO BOR in July 2019, a branch of RBM Bor for:

  1. Investigative drilling from the surface of the terrain on the location of Bor, west of the old surface digs Bor
  2. Exploration drilling from underground facilities at the Jama-Bor site
  3. Exploratory RC drilling from the surface at the Velike Krive and Majdanpek mines

The deadline of realization is nine months.