Drilling along the route inclines

BOR – Horizontal Investigative drilling

The Upper zone of the massive sulfide deposits of Čukaru Peki is located outside the town of Bor in Serbia. Works on the construction of the investigative route inclines on the project Čukaru Peki began on June 2018. Year.
The construction of two investigative route inclines is planned. For the control of geological conditions when mining and mineral works are performed, 9 horizontal investigative wells were designed in the direction of the fall of the mining room.
December 2018   GEOING GROUP performed the first horizontal borehole length 250,30 m.

Ordering party: OSTU-STETTIN CONSTRUCTION D.O.O.

Realization period: 2018/2020

Activities: Investigative Drilling, Special works